Within its Corporate Social Responsibility (CSR), Sirte Oil Company reported that its Communications and Information Technology Department had recently implemented several projects providing a service to some sectors and companies.
These included the installation of a solar-powered electricity generation system at the Hawari Cement Factory in order to feed its communications system, and link it to the Al-Talhiya system, the North Benghazi system, and the Benina site system.
Another project involved cooperation with the Ras Lanuf Oil and Gas Manufacturing Company by extending a 160-meter copper cable that connects the centimetre station with Foyhat Post Office to the Sirte communication trailer with a capacity of 100 pairs and was linked to the submarine cable and the Ras Lanuf system, and this work opened a direct communication channel from Benghazi to the company’s Ras Lanuf headquarters.