The general Electricity Company of Libya declared that the second, fifth and sixth production units in Zueitina station suspended their operations because of the low gas pressure.
In a statement, GECOL announced that 600 megawatts were lost, adding that the third and fourth production units in North Benghazi lost 230 megawatts too.